Please provide capacity in KG/h or metric tons per day LNG production
Composition of the gas to be liquefied (analysis in MOL% including H2S & Mercury)
What is the highest Inlet gas pressure?
What is the lowest Inlet gas pressure?
If the gas comes from an existing piping system (as tie-inn) is that pipeline protected by a safety valve? What is the set pressure of that valve?
What is the highest Inlet gas temperature?
What is the lowest Inlet gas temperature?
Would you prefer gas engine or electrically driven compression equipment ?
If you need electrically driven, please give voltage and frequency
If local power supply is not possible (island situation) then the plant will be equipped with gas driven gen-sets. Is this desired?
If yes, please give: maximum supply temperature , supply pressure , allowable pressure drop ,quality of cooling water
What is the plant location?
What are the ambient conditions at future site location?
Is cooling water available?

If no, is there a possibility to obtain make-up water, like: ground water , river close by , municipality water or alike , lake , other.
What is the elevation of the site?
Earthquake zone applicable?

If yes, give category by an internationally known standard (for example by UBC)
What is the desired LNG storage capacity in terms of LNG production per day (3 days, 5 days, …)?
In the country of installation, are there specific codes & standards to be followed, if so which ones will apply?

Do you have an "Approved Supplier List" where it concerns the supply of equipment like turbines, compressors, valves, control systems, …?
A minimum required plot-space of 100 x 100 meters includes a storage area for 3-days production, 2 x truck loading points & scales, parking for 6-10 trucks and the control building. Is this space available as a minimum?
Can more space be required, for example for extended storage facilities, offices, warehouses, ...?