| Year |
Country |
Client |
Description |
| 2011 |
The Netherlands |
GASUNIE |
Study and appraisal feasibility LNG transfers in Port of Rotterdam |
| 2010 |
The Netherlands |
Vos / The Netherlands |
Design-, supply-, installation and commissioning of first LNG filling station for trucks in The Netherlands |
| 2010 |
The Netherlands |
Deen Shipping / The Netherlands |
Complete design-, construction-, supply-, installation and start-up of 40 m3 LNG storage and re-gasification system for propulsion of riverboat on LNG |
| 2010 |
Iran |
Delvar Afzar / Iran |
Design-, construction and supply of cryogenic back-up system for LIN/LOX/Lar |
| 2010 |
Iran |
Fajr / Iran |
Design-, construction- and supply of complete instrument air system |
| 2009 |
Iran |
Delvar Afzar / Iran |
Supply of 2x cryogenic trailers for LIN/LOX/Lar |
| 2009 |
Ecuador |
Petrocomercial / Ecuador |
200 MTD Natural Gas Liquefaction plant complete with cooling-water system, power generation system, storage, truck-filling for LNG, etc… |
| 2009 |
Iran |
Arak Refinery |
Supply of NH3 trailers (2-off) |
| 2008 |
France |
Praxair / Belgium |
Dismantling-, repair-, re-installation and start-up 450 Nm3/h nitrogen plant. |
| 2008 |
Bosnia |
Messer / Germany/Bosnia |
Complete Design and Delivery of Storage and Back-up facilities, including truck-filling for LIN, LOX and Lar, for the Messer-Zenica Bosnia Project, Bosnia |
| 2007 |
Iran |
Arak Refinery |
10.000 Nm3/h steam driven nitrogen vaporizer, completely skid-mounted, with steam supply, etc… |
| 2007 |
Spain |
Messer / Spain |
Complete Design and Delivery of Storage and Back-up facilities, including truck-filling for LIN, LOX and Lar, for the Messer-4 Tarragona Project, Spain |
| 2007 |
Iran |
YAZD |
Design, construction and delivery of complete oxygen, nitrogen and argon plant, 120 MTD, with booster oxygen compressor for YAZD Rolling Mill, Iran. |
| 2006 |
Poland |
PL-Energia |
100 MTD Natural Gas Liquefaction plant complete with cooling-water system, power generation system, storage, truck-filling for LNG, etc… |
| 2006 |
Egypt |
APRC |
Design and Construction complete nitrogen plant 600 GAN + 70 LIN, Amerya Petroleum, Alexandria, Egypt |
| 2006 |
Dubai, UAE |
Foster-Wheeler / ENOC Dubai |
Complete Storage and B/U Nitrogen Supply system for Foster-Wheeler Cy, Reading UK. Final client ENOC in Dubai (UAE). Package consists of 2x 75 m³ nitrogen tanks @ 14 barg, ambient vaporizers (4-off) with continuous duty of 3.500 Nm³/h GAN supply. Low Temperature Protection System; Main process module (skid mounted) . Instrumentation per Foundation Fieldbus . |
| 2005 |
Ahwaz, Iran |
Delvar-Afzar Industrial Gases, Tehran |
Complete storage and B/U system for the Ahwaz (Iran) Air Separation Plant (Linde scope). Transfer and storage of LIN/LOX and Lar. Pipeline GOX supply to steel-mill regulation on flow and pressure @ 18 barg. Gaseous Argon supply to steelmill. Truck-filling facilities for LIN/LOX/Lar. Vaporization back-up system (ambient) for 16.000 Nm³/h GOX @ 18 barg full continuous, and Gar 1.500 Nm³/h @ 12 barg full continuous. Complete control system for the entire storage and B/U system. Detailed design and engineering, supply of all equipment, including 7 cryogenic pumps, PLC system, control room, etc… |
| 2005 |
Bahrain |
Technip LA, USA / JGC Bahrain |
LIN storage and vaporization system; 2x 110.000 litres LIN storage tanks @ 25 barg. Steam vaporizer 12.000 Nm³/h GAN @ 18 barg. Ambient vaporizers 6.000 Nm³/h GAN @ 18 barg. Complete with pressure building system, interconnecting piping, truck-filling, etc… |